Transformative Energy Projects
Training in installation of medium voltage joints and terminations
Training the engineers of ILVIEF on the proper installation of Tyco medium voltage joints and terminations.
Transmission Network Mapping
Inspection of the condition of the aerial network of IPTO using unmanned means (drones) and helicopter equipped with high-tech optical equipment.
150kV Cable Terminations by TE Connectivity
Installation of 150 kV termination boxes by TYCO at the substations in Syros, Mykonos, Paros, and Lavrio for ADMIE in collaboration with TDPower.
DGA TM8 Hot-Zone Servicing
Replacement of the Hot-Zone consumables, the Helium (He) bottle, and the calibration bottle in the DGA TM8 device at the Aracthos EHVC of ADMIE.
DGA TM2 Servicing
Cleaning actions for oil pipelines in DGA TM2 devices at the substations of Omalia, Evangelismos, and Stavros for TERNA ENERGY.
Oil sampling valve for the DGA TM8
Replacement of the Hot-Zone consumable and addition of an oil sampling valve in the DGA TM8 device at the Pallini EHVC of ADMIE.
On-Line Monitoring System
Installation and commissioning of the DGA TM2, QPDM & TGuard Transformer Control System (TCS) by Qualitrol at the substations in Omalies, Evangelismos & Stavros in the Kafireas (Karystos) area on behalf of TERNA ENERGY.
Partial Discharge Monitoring System (QPDM)
Installation and commissioning of the Partial Discharge Monitoring System (QPDM) by Qualitrol at the Komotini GIS 400 kV Extra High Voltage Center (EHVC) on behalf of SIEMENS.
Installation of Heating Cable
Installation of heating cable by NVENT in the asphalt and fuel oil circuits on behalf of ALKI ASPHALT.
DGA TM8 Transformer Control System (TCS) by Qualitrol
Autotransformer Control System (ACS)
Installation and commissioning of an integrated Autotransformer Control System (ACS) DGA TM8, QTMS & Bushing Monitoring by Qualitrol at the Extra High Voltage Centers (EHVC) in Agios Stefanos, Thessaloniki, and Megalopolis on behalf of IPTO (ADMIE).