Discover how ENIA S.A. is pioneering advancements in the energy sector through innovative projects. From high-voltage installations to cutting-edge control systems, our projects drive efficiency and sustainability, ensuring reliable energy solutions for a brighter future.

150 kV termination boxes by TYCO

Installation of 150 kV termination boxes by TYCO at the substations in Syros, Mykonos, Paros, and Lavrio for ADMIE in collaboration with TDPower.

Transformer Control System

Installation and commissioning of the DGA TM2, QPDM & TGuard Transformer Control System (TCS) by Qualitrol at the substations in Omalies, Evangelismos & Stavros in the Kafireas (Karystos) area on behalf of TERNA ENERGY.

Partial Discharge Monitoring System (QPDM)

Installation and commissioning of the Partial Discharge Monitoring System (QPDM) by Qualitrol at the Komotini GIS 400 kV Extra High Voltage Center (EHVC) on behalf of SIEMENS.

Installation of Heating Cable

Installation of heating cable by NVENT in the asphalt and fuel oil circuits on behalf of ALKI ASPHALT.

DGA TM8 Transformer Control System (TCS) by Qualitrol

Installation and commissioning of the DGA TM8 Transformer Control System (TCS) by Qualitrol at the Kozani EHVC for ABB-HITACHI.

Autotransformer Control System (ACS)

Installation and commissioning of an integrated Autotransformer Control System (ACS) DGA TM8, QTMS & Bushing Monitoring by Qualitrol at the Extra High Voltage Centers (EHVC) in Agios Stefanos, Thessaloniki, and Megalopolis on behalf of IPTO (ADMIE).