Project: On-Line Monitoring System

Another Successfully Completed Project
Date:

July 2022, March – April 2023

Client:

TERNA Energy

The project referred to the online monitoring of the operation of 6 Power Transformers installed in a large wind farm close to Karystos. The project was carried out in two phases including winding monitoring, gas analysis and partial discharge detection. Enia installed and commissioned Qualitrol products, DGA TM2 for the gas analysis, QPDM for the partial discharge detection and TGuard Transformer Control System (TCS) for the temperature measurement.