Projects
Transformative Energy Projects
150 kV termination boxes by TYCO
Installation of 150 kV termination boxes by TYCO at the substations in Syros, Mykonos, Paros, and Lavrio for ADMIE in collaboration with TDPower.
Transformer Control System
Installation and commissioning of the DGA TM2, QPDM & TGuard Transformer Control System (TCS) by Qualitrol at the substations in Omalies, Evangelismos & Stavros in the Kafireas (Karystos) area on behalf of TERNA ENERGY.
Partial Discharge Monitoring System (QPDM)
Installation and commissioning of the Partial Discharge Monitoring System (QPDM) by Qualitrol at the Komotini GIS 400 kV Extra High Voltage Center (EHVC) on behalf of SIEMENS.
Installation of Heating Cable
Installation of heating cable by NVENT in the asphalt and fuel oil circuits on behalf of ALKI ASPHALT.
DGA TM8 Transformer Control System (TCS) by Qualitrol
Autotransformer Control System (ACS)
Installation and commissioning of an integrated Autotransformer Control System (ACS) DGA TM8, QTMS & Bushing Monitoring by Qualitrol at the Extra High Voltage Centers (EHVC) in Agios Stefanos, Thessaloniki, and Megalopolis on behalf of IPTO (ADMIE).